Tuesday, August 1, 2023

JRL PIC - Updated with new 3D station models

 

1 August 2023 - A view of the Choa Chu Kang station complex, which will feature 10 platforms
when completed - 4 for the LRT, 3 for the NSL & 3 for JRL.

A recent post by MP for Keat Hong divison, Mr. Zhulkarnain Abdul Rahim, showed a visit to the Jurong Region Line (JRL) Project Information Centre (PIC) featuring new station architectural models. Our team made a visit to the JRL PIC today to check out the new additions to the collection.

View more images after the jump.

With the new additions, these are stations which have 3D Architectural models available for viewing at the PIC: 

Jurong Region Line models available

Phase 1

Phase 2

Phase 3

JS01 – Choa Chu Kang

JE1 – Tengah Plantation

JS09 – Enterprise

JS02 – Choa Chu Kang West

JE2 – Tengah Park

JS10 – Tukang

JS03 – Tengah

JE3 – Bukit Batok West

JS11 – Jurong Hill

JS04 – Hong Kah

JE5 – Jurong East

JS12 – Jurong Pier

JS05 – Corporation

JE7 – Pandan Reservoir

JW03 – Nanyang Gateway

JS08 – Boon Lay

 

JW04 – Nanyang Crescent

JW01 – Gek Poh

 

JW02 - Tawas


JS1 - Choa Chu Kang

1 August 2023 - A view of the station complex from the north.

1 August 2023 - A view of the viaduct layouts north of the station.

1 August 2023 - An aerial view of the station roof which will match
the colour of the existing station.

1 August 2023

1 August 2023 - A view of the side of the station model.

1 August 2023 - Winding viaducts to the north to avoid the condominiums there.

1 August 2023 - A view of the roadway along Choa Chu Kang Avenue 4.

1 August 2023 - The southern end of the station - work is underway to remodel the southern portion
of the North-South Line station.

1 August 2023 - Model view along Choa Chu Kang Avenue 4.

1 August 2023

JS2 - Choa Chu Kang West

1 August 2023 - An aerial view of the station.

1 August 2023 - An aerial view of the station roof.

1 August 2023 - A view of the side of the station model.

1 August 2023 - A view of the station at the junction with Choa Chu
Kang Avenue 1.

1 August 2023

JS3 - Tengah

1 August 2023 - A view of the side of the station model.

1 August 2023 - An aerial view of the station roof design.

1 August 2023 - A view of the tracks south of the station.

1 August 2023 - An aerial view of the station model from the south.

1 August 2023 - A view of the station from the north.

1 August 2023

1 August 2023

1 August 2023

1 August 2023 - Track & viaduct layout north of the station.

JE5 - Jurong East

1 August 2023 - A view of the Jurong East station addition, from the location of the JTC Summit
building.

1 August 2023 - Track arrangements on the eastern end of the station.
Tengah bound trains will use the lower platform while those bound
for Pandan Reservoir will use the upper platform.

1 August 2023 - A view of the station model and the existing link bridge connecting to the
new temporary bus interchange.

1 August 2023 - A view of the station model through the new buildings to be developed to the west
of the station.

1 August 2023 - A view of the transfer connection annex at the western end of the station.

1 August 2023 - A view of the station cross section from the west.

1 August 2023 - An aerial view of the station model.

1 August 2023 - A view of the station building and new link bridge connection to the site of
J Cube mall.

1 August 2023 - A peek inside the cut-away of the transfer connection annex.

1 August 2023 - A view of the transfer connection annex near Platform A.

1 August 2023 - A view of the side of the station model.

1 August 2023

1 August 2023 - The eastern end of the station showing the JRL addition and the existing station
roofing.

1 August 2023

1 August 2023

JE7 - Pandan Reservoir

1 August 2023 - A view of the side of the station model with the street, mezzanine, concourse &
platform levels visible.

1 August 2023 - An aerial view of the station model from the north. The tracks to the south
extend over a wide track slab.

1 August 2023 - A view of the station model at the junction with Pandan and Teban Gardens &
Jurong Town Hall Road.

1 August 2023 - The former junction with Teban Gardens has been permanently closed. The road
will be turned into a cul de sac near the station entrance.

1 August 2023 - A view of the station model from Pandan Gardens.

1 August 2023 - An aerial view of the station model.

1 August 2023 - A view of the station model from the south-east, where Commonwealth Secondary
School is located.

1 August 2023 - The tracks curve eastwards, crossing a rather wide viaduct
slab en route.

1 August 2023

JW3 - Nanyang Gateway

1 August 2023 - An aerial view of the station model looking westwards.

1 August 2023 - An aerial view of the station model looking eastwards.

1 August 2023 - A view of the side of the station model.

1 August 2023

1 August 2023

JW4 - Nanyang Crescent

1 August 2023 - A track-level view of Nanyang Crescent station. NIE is on the right and the
North Spine building on the left.

1 August 2023 - An aerial perspective of the station model.

1 August 2023 - An aerial perspective from the North Spine building.

1 August 2023

1 August 2023 - A view of the station link bridge and entrance connecting to the street level.

1 August 2023 - A view of the station model entrance at the NIE building.

1 August 2023 - The North Spine building entrance.

1 August 2023 - A view of the eastern end of the station where there
will be a lower concourse level.

In addition, we also managed to get a few pictures of how the PIC looks like on the inside, which we had missed out previously due to time constraints. Information panels which we had previously posted are available for viewing at the PIC. A corner also holds exhibits such as a mock up of the seats to be used on the line's trains once they are ready.

1 August 2023 - The interior of the JRL PIC

1 August 2023 - A corner with exhibits in place, including some mock up seats that will be used
in the JRL train.

1 August 2023 - Another view of the interior of the JRL PIC.

Speaking of the trains... Do stay tuned for an upcoming update on them in action in South Korea.

This post will also be available on Instagram & Facebook on 2 August 2023.

No comments:

Post a Comment