Recently, we came across some new information on the expected timeline for the line and contract tender and award.
 |
Source: LTA |
Based on this, we can presume that the stations will be announced sometime between 2017 and 2018.
 |
Source: HDB |
 |
Source: HDB |
Additionally, these two documents from HDB show an indicative corridor for the JRL's 2001-era plan. The plot for the JRL depot may still be located at the same area as in the plans shown above.
No comments:
Post a Comment