Pre-construction - Choa Chu Kang West

Choa Chu Kang West station under contract J102 is located along Choa Chu Kang Avenue 3, near the Sunshine Place neighbourhood shopping centre. Currently, Choa Chu Kang Avenue 3 is a two-lane double carriageway which will soon give way to a widened road median once construction works begin.

30 September 2018 - Satellite image of Choa Chu Kang Avenue 3 where the Choa Chu Kang West station will be located.
Source: Google Earth 

Google Earth's current latest satellite imaging is dated to 30 September 2018 and will serve as a throwback to how the area looked in time to come. The future station is likely to be of a side platform design to keep the tracks as far away from the Housing & Development Board (HDB) flats that flank both sides of the roadway.

25 February 2018 - Aerial view of Choa Chu Kang Avenue 3 looking eastwards.

25 February 2018 - Aerial view of Choa Chu Kang Avenue 3 looking westwards to the junction
with Choa Chu Kang Avenue 1.

25 February 2018 - Aerial view of Choa Chu Kang Avenue 3 looking westwards into Tengah.

25 February 2018 - Aerial view of Choa Chu Kang Avenue 3 looking eastwards, the existing MRT line can be seen in the background.

25 February 2018 - A street level view of Choa Chu Kang Avenue 3 looking westwards, from below the current MRT viaduct.
As the current road median is rather narrow, it can be expected that the carriageways will be pushed further out once construction begins. This would allow the viaduct to keep to the middle of the roadway, allowing for ample space from the residential blocks. To keep noise levels to a minimum, full height noise enclosures may be deployed as seen in the concept art below.

Concept art for JRL station 02.
Source: Mauro Moro